PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued laying out block at the 1st floor locker rooms Facing South.jpg Electrical wiring the 2nd floor VAV boxes Facing North.jpg Installed junction boxes at the cmu walls Stair -3 Facing South.jpg Saw cutting the slab on grade at the Boiler-Electrical Room Facing North.jpg Installed roof drain protectors at the High Roof Facing South.jpg Installing electrical wire above the ceiling at the 4th floor Facing West.jpg Installing the Low Roof insulation Facing West.jpg Installing insulation along the parapet Facing South.jpg Installing the curtain wall mullions around the Monumental Stair radius Facing South.jpg
Previous pageNext page Installed roof drain protectors at the High Roof Facing South
Installed roof drain protectors at the High Roof Facing South